How Much Is the Boiler Upgrade Scheme Grant and How Long Is the Wait?

The Boiler Upgrade Scheme (BUS) offers a £7,500 grant toward an air source or ground source heat pump in England and Wales, applied for by your MCS-certified installer, with current survey-to-installation waiting times running 8–16 weeks depending on regional installer capacity in August 2026.

Grant Criteria: Who Qualifies

  1. Property type: Domestic properties in England and Wales with an existing fossil fuel heating system (oil, LPG, or mains gas boiler) being replaced.
  2. Grant value: £7,500 flat rate for both air source heat pumps (ASHP) and ground source heat pumps (GSHP) — GSHP installs cost significantly more to install but receive the same grant amount.
  3. EPC requirement: A valid Energy Performance Certificate with no outstanding loft or cavity wall insulation recommendations, unless your installer confirms these aren't cost-effective for your property.
  4. Installer requirement: Must be fitted by an installer certified under the Microgeneration Certification Scheme (MCS) — the grant is claimed by the installer on your behalf and deducted directly from your quote, not paid to you as a reimbursement.
  5. Biomass note: Biomass boiler support under BUS was withdrawn from the scheme in April 2025 — only ASHP and GSHP installations currently qualify.

Typical Cost After the Grant


System Type

Typical Installed Cost

BUS Grant

Net Cost to Homeowner

Air Source Heat Pump

£11,000–£16,000

£7,500

£3,500–£8,500

Ground Source Heat Pump

£20,000–£35,000

£7,500

£12,500–£27,500

Current Waiting Times: What's Driving the Backlog

Demand for MCS-certified installers has risen sharply through 2025–2026, driven by rising gas prices and expanded local authority retrofit schemes running alongside BUS. Homeowners should expect:

  1. Initial survey booking: 2–4 weeks from first enquiry with a reputable installer
  2. Quote-to-installation slot: 6–12 weeks in most regions, longer in high-demand areas like the South East and parts of Scotland's equivalent Home Energy Scotland scheme
  3. Total time from enquiry to a working heat pump: typically 8–16 weeks end to end

How to Shorten the Wait

  1. Get 3 MCS installer quotes in parallel rather than sequentially — this is the single biggest lever homeowners have over total wait time.
  2. Apply in late summer or early autumn (like now, August 2026) to avoid the pre-winter surge in October–December, when installer books fill fastest.
  3. Confirm grant fund availability with your installer upfront — BUS operates on a first-come basis and Ofgem periodically reports funding drawdown levels.